The Pre-Build Stage
After your initial contact with L & L Construction a member of our customer service team will assist you through the first stages of selecting a swimming pool to suit your needs and make an appointment with one of our pool building consultants.
Once an appointment has been made the consultant will meet with you at the proposed pool site. At this initial consultation, they will assess the site suitability and you can discuss any special requirements for your pool further.
Your consultant will then prepare a tailor-made design and quote for your swimming pool in consultation with other members of the L & L Construction pools team.
When you are satisfied with the consultant's proposal, he will prepare your contract and commence the pre-build phase.
The Build
Stage 1: Plans
Our engineer will prepare plans for your new pool based on your specifications and the quote for the chosen pool design. These are submitted by us directly to our private certifier. Once this has been done our construction supervisor will contact you to arrange a suitable start date.
Stage 2: Excavation
The site is excavated and steel reinforcement is delivered.
Stage 3: Structural shell
The excavated site is then boxed and steeled, after which the concrete shell is poured in.
Stage 4: Coping/Tiling
Your coping is delivered to the site. Our subcontractor will then lay the coping and tile band if applicable.
Stage 5: Filtration equipment
Your pool filtration equipment will be delivered to the site and installed.
Stage 6: Pebble interior
Once all fencing requirements are completed and approved by the certifier, the pool interior will be completed. Pebble interiors are usually acid washed the following day, after which the pool can be filled.